D3 Energy: Higher Flow Rates at RBD03 After Well Clean-Out

D3 Energy gas flow rates

RBD03 Gas Flow Rates Jump 35% After Clean-Out

Following a recent well clean-out, flow testing at the legacy RBD03 borehole has shown encouraging results. Over an initial 7-day period, RBD03 produced an average gas flow rate of 201 Mscfd. This represents a significant 35% increase compared to the flow rate measured before the well clean-out.

Leave a Reply